Year of Construction: 2014
Area: 11000m2
Employee: 115
Production capacity: Focus on HPDC tooling below 5000T for the Light weight structural parts tooling,Electric drive system tooling, Powertrain system tooling, etc.
Annual Output: 200 Million CNY
ZDM(Zhenzhi) Machinery & Mould Co.,Ltd. was established in 1999. It is a national high-tech enterprise dedicated to the research and development and manufacture of various large-scale and precision die-casting molds, and a national-level professional, special and new "little giant" enterprise.
After years of development, the company has become a leading enterprise in the field of new energy vehicle die-casting molds, ranking the top three in the domestic die-casting mold industry, and is one of the professional die-casting mold manufacturers with the strongest comprehensive strength and the fastest development speed in China. , Italy, Japan, the United States, Southeast Asia and other countries have many customer groups, and has been rated as "Excellent Supplier of the Year" by well-known domestic and foreign companies for many times, and has entered the world-renowned new energy vehicle mold supplier system.
The company will uphold the corporate vision of "Industry Leading, Improvement Lasting", continue to develop and innovate, and make unremitting efforts to become a world-class die-casting mold enterprise!
Year of Construction: 2014
Area: 11000m2
Employee: 115
Production capacity: Focus on HPDC tooling below 5000T for the Light weight structural parts tooling,Electric drive system tooling, Powertrain system tooling, etc.
Annual Output: 200 Million CNY
YearofConstruction: 2020
Totalinvestment: 250 Million RMB
Employee plan: 265
Area: Total 27500m2,including 11000m2 for production workshop,6000m2 for tooling assembly workshop
Hardware equipment: 200T/120T/100T crane,800T/1200T die spotting machine
Production capacity: Focus on Mega/Giga Casting tooling of 6000T and above(Rear floor/Front floor/Battery Pack)More than 5 sets of 6000T and above mega/giga casting tooling each month
Annual Output: 800 Million CNY
Year of Construction: 2006
Area: 13300m2
Production capacity: Focus on Mega/Giga Casting tooling of 6000T and above(Rear floor/Front floor/Battery Pack)
Annual Output: 300 Million CNY